Cable & Connect celebrates 10 years of connecting people, spaces and technology across Melbourne—and thanks the clients, team and partners behind the journey.
Cable & Connect has completed a range of electrical and lighting works at Melbourne’s Shrine of Remembrance, from stairwell and garden lighting to fault finding, power installations and tower lighting. For Day 10 of our 10-year countdown, we look back at one of the most memorable locations we’ve had the opportunity to work.
A look back at Cable & Connect's extensive Red Hill project combining CCTV, Bosch alarm systems, gate intercom, data and communications, shed power, lighting and more than 70 metres of cabling.
A look back at Cable & Connect's electrical work for the installation of a new FANUC industrial robot at Natex Engineering, showcasing another side of our commercial and industrial capabilities.
A detailed Kew man cave and garage fit-out featuring exposed copper conduit, heritage switches and power points, feature pendant lighting and an electrical installation designed to complement the character of the space.
With Melbourne still experiencing lockdowns in 2021, Cable & Connect installed a dedicated AV and video setup for a gym to help its team deliver fitness classes remotely and stay connected with members.
When video conferencing demand surged in 2020, Cable & Connect designed and delivered eight mobile conferencing systems for YSAS. Six years and several technology upgrades later, all eight remain in daily use across their sites.
Our first Frame TV installation brought a unique challenge: a solid brick wall. See how concealed ducting and a floor box kept this Heidelberg project tidy.
ur first boardroom video conferencing project featured an 86-inch touchscreen at The Leprosy Mission in Box Hill—and took four people to carry it upstairs.
For Day 1 of our anniversary series, we revisit our first large project: four Mitsubishi Electric ceiling cassettes installed at a Heidelberg school in January 2018.